Integrated Fire Engineering and ResponseCOST action network number TU0904 in domain Transport and Urban Development |
Issues of the last year of our Action are WP4, WP6 and WP7.
The meeting will be focued on WP4 - Benchmarks studies.
WP4 Benchmarks for structural fire engineering: 13-06-20 Manual for preparation
Preparation of new Action: Smoke and Heat Control, Resilience of building environment against disasters
Last change May 2013